Our team arrived in Goldfield Nevada at our miner’s camp location on October 25th and started prepping our stakes and staking equipment.
October 26th, we did a bird’s eye evaluation of our claims by driving 3 hours though several adjacent canyons and several mountain ranges. This allowed our team to run the Arial drone and we were able to identify the accessible roads to efficiently navigate and stake these highly valuable sections.
We also located the original 1958 USGS Benchmark Monument just off the Nevada State Hwy 265 and an additional (NDOT) Nevada Department of Transportation Benchmark Monument just off Nevada State Hwy 6 and burned those two locations on to our GPS Map so our claims are "dead-on" survey precise.
October 27TH the team moved all our equipment to a base location about ¼ mile from the NW corner of the planned claiming area. The team into two groups, the onsite stake prepping group and the staking and sampling group. The staking group staked and sampled the first 6 claims and developed a solid plan going forward.
October 28th the team staked and sampled 8 more lode claim.
October 29th the team really hit its stride we sampled and staked 12 lode claims.
October 30th the team sampled and staked 14 lode claims giving us approx. 900 acers +/-
Nevada Lithium Exploration
Copyright © 2025 Nevada Lithium Exploration - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.